May. 26, 2025
具体实施方式 Detailed ways
With competitive price and timely delivery, Yipeng sincerely hope to be your supplier and partner.
如图1、图2和图3所示,本实用新型安装在铁塔边相横担1上,包括卡具2、丝杆3、绝缘拉杆6和挂钩7,丝杆3的下端连接绝缘拉杆6,绝缘拉杆6的下端连接挂钩7;安装时,先将卡具2通过穿过定位销孔24的销杆25左右对称安装于铁塔边相横担1上,位置关于空气动力型绝缘子串5对称,然后将丝杆3、绝缘拉杆6和挂钩7的装配件安装到卡具2上的安装通孔23中,拧紧穿过销钉孔21的销钉26来夹紧丝杆3,丝杆3上加工有卡口,卡在半长圆孔22中,用于限制丝杆3的周向旋转;旋转丝杆3上的扳手4来调节丝杆3的长度使挂钩7勾住导线8。 As shown in Fig. 1, Fig. 2 and Fig. 3, the utility model is installed on the side arm 1 of the iron tower, including a fixture 2, a screw rod 3, an insulating pull rod 6 and a hook 7, and the lower end of the screw rod 3 is connected to the insulating pull rod 6 , the lower end of the insulating pull rod 6 is connected to the hook 7; when installing, first install the clamp 2 symmetrically on the iron tower side phase cross arm 1 through the pin rod 25 passing through the positioning pin hole 24, and the position is symmetrical with respect to the aerodynamic insulator string 5 , then the assembly parts of the screw mandrel 3, the insulating pull rod 6 and the hook 7 are installed in the installation through hole 23 on the fixture 2, and the pin 26 passing through the pin hole 21 is tightened to clamp the screw mandrel 3, and the screw mandrel 3 is processed There is a bayonet, which is stuck in the semi-oblong hole 22, and is used to limit the circumferential rotation of the screw mandrel 3; rotate the wrench 4 on the screw mandrel 3 to adjust the length of the screw mandrel 3 so that the hook 7 hooks the wire 8.
Available for any voltage and contamination level by changing number of insulators
High reliability is achieved by long-term experience and accumulation of technology.
High strength porcelain insulators require not only higher amount of alumina but also
In addition to ISO certified,
Hydraulic Pressure Test
The company is the world’s best Aerodynamic Glass Insulator supplier. We are your one-stop shop for all needs. Our staff are highly-specialized and will help you find the product you need.
Thermal-Mechanical (T&M) performance test as per IEC -1 or ANSI C29.2 is to evaluate long-term reliability of insulators.
As these standards specify minimum requirements only, all NGK insulators have been confirmed to pass modified T&M test.
To exclude poor quality insulators, M&E test results before and after T&M test are:
(R: mean value, s: standard deviation)
Contaminated and wet insulators display a biased leakage current having DC component. This DC component causes electrolytic corrosion and reduction of pin diameter.
NGK developed Zinc Sleeve to prevent pin corrosion.
NGK suspension (disc) insulators meet the requirements and tests of the following standards.
For more Composite Insulatorinformation, please contact us. We will provide professional answers.
Previous: The Ultimate Buyer's Guide for Purchasing Aerodynamic Glass Insulator
Next: Why Should You Trust Aerial Bundled Cable Wholesalers?
If you are interested in sending in a Guest Blogger Submission,welcome to write for us!
All Comments ( 0 )